Sunday, June 28, 2009

Industrial Training Week 10

Summary of week 10

Monday – 22 June 2009

Submittion of video storyboard of Raising of Timah Tasoh Dam, Perlis to Managing Director, Ir. Mohd Adnan for review and discussion

Reviewing the video storyboard

Preparation of report


Tuesday - 23 June2009

Discussion of video storyboard of Raising of Timah Tasoh Dam, Perlis with Managing Director, Ir, Mohd Adnan. Comments

a) Need to be more technical

b) Include specification

c) Step by Step explanation

Review of video story board

Wednesday - 24 June2009

Editing the video storyboard of Raising of Timah Tasoh Dam, Perlis

Include photos taken on site and using Google Sketch Up

Preparation of Tender Document for Rancanagan Tebatan Banjir Sungai Linggi, Negeri Sembilan - Package 3

Thursday - 25 June2009

Attended brieffing to contrtactor by Wong Phey Yean for project Rancangan Tebatan Banjir Sungai Kangsar/ Sungai Lawin, Perak. Menaik Taraf Sungai Kangsar, Phase 1 Peringkat 2 at JPS Perak, Kuala Kangsar

Included site visit and site survey

Preparation of Tender Document for Rancanagan Tebatan Banjir Sungai Linggi, Negeri Sembilan - Package 3


Friday - 26 June 2009

Preparation of Tender Document for Rancanagan Tebatan Banjir Sungai Linggi, Negeri Sembilan - Package 3

Helping out Azizi, draftsman to complete the drawing for tender submittion

Sunday, June 21, 2009

Industrial Training Week 9

Summary of week 9

Monday – 15 June 2009

Calculation of excavation for Sungai Linggi to include in BQ.

Attended Staad Pro presentation version V8i and PROKON

Plotting and calculating the area for land aquisition for project Rancangan Tebatan Banjir Sungai Linggi


Tuesday - 16 June2009

Plotting and calculating the area for land aquisition for project Rancangan Tebatan Banjir Sungai Linggi

Analysis using HEC-RAS to obtain Q versus WS elevation for Magaga, Tomas and Watari Dam


Wednesday - 17 June2009

Attended talk held by Jurukur Perunding. Introducing 3 new products

a) Geoeye

b) Nextmap

c) Navcom

for GIS purposes

In house training by Ashrin titled "How to Write a Good Letter."


Thursday - 18 June2009

Analysis Using HEC-RAS with new information of Magaga, Watari and Tomas Dam

Learning of Sketch Up

Friday - 19 June 2009

Learning of Sketch Up

Half day~

Sunday, June 14, 2009

Industrial Training Week 8

Summary of week 8

Monday – 8 June 2009

Geotechnical analysis for piling works for outlet structure at pond near Pengkalan Durian, project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan. Package 3

Preparation of Tender Document for project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan - Package 3


Tuesday - 9 June 2009

Reviewing outlet stucture design with Nasrullah

Reviewing data from HEC-RAS for the outlet stucture design with Nasrullah

Wednesday - 10 June 2009

Design of Outlet Structure with Nasrullah

Calculating the volume of works for

a) Excavation

b) Trimming and Turfing

c) Road

d) Bund

e) Drainage

for Parit Haji Yusof and Pematang Pasir to complete the Bill of Quantities in Tender Document for project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan, Package 3

Discussed story board for video preparation of Raising of Timah Tasoh Dam, Perlis with Ir Mohd Adnan

Obtained detail information of how the saddle dam was raised from En Rizwan

Thursday - 11 June 2009

Revising the video preparation of Raising of Timah Tasoh Dam, Perlis

Friday - 12 June 2009

Revising the video preparation of Raising of Timah Tasoh Dam, Perlis

Calculating the number of piles required for the outlet structure based on the ultimate load, Qu obtained from the previous calculation

Sunday, June 7, 2009

Industrial Training Week 7

Summary of week 7

Monday – 1 June 2009

Reinforced concrete design for wall for drainage at Parit Haji Yusoff for the project, Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan using,

1) Hand calculation

2) PROKON


Review of the video making of Raising of Timah Tasoh DAm, story board

Tuesday - 2 June 2009

Using Sigma-W to analysis the soil stability for sheet pile


Meeting with JPS Negeri Selangor to submit and dicuss on the issue of wallguard wall at Sungai Rasa, Klang

Wednesday - 3 June 2009

Continuation of analysis and esign using PROKON and SIGMA - W

Thursday - 4 June 2009

Geotechnical analysis for piling works for outlet structure at pond near Parit Haji Yusof, project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan

Folding 160 A1 drawing for submittion for the project Raising of Timah Tasoh Dam, Perlis


Friday - 5 June 2009

Continuation of folding A1 drawings for submittion for the project Raising of Timah Tasoh Dam, Perlis


Preparation of Tender Document for project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan - Package 3

Attending the in-house training by Wan Yusnira on Hydrological Procedure 1