Sunday, June 14, 2009

Industrial Training Week 8

Summary of week 8

Monday – 8 June 2009

Geotechnical analysis for piling works for outlet structure at pond near Pengkalan Durian, project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan. Package 3

Preparation of Tender Document for project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan - Package 3


Tuesday - 9 June 2009

Reviewing outlet stucture design with Nasrullah

Reviewing data from HEC-RAS for the outlet stucture design with Nasrullah

Wednesday - 10 June 2009

Design of Outlet Structure with Nasrullah

Calculating the volume of works for

a) Excavation

b) Trimming and Turfing

c) Road

d) Bund

e) Drainage

for Parit Haji Yusof and Pematang Pasir to complete the Bill of Quantities in Tender Document for project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan, Package 3

Discussed story board for video preparation of Raising of Timah Tasoh Dam, Perlis with Ir Mohd Adnan

Obtained detail information of how the saddle dam was raised from En Rizwan

Thursday - 11 June 2009

Revising the video preparation of Raising of Timah Tasoh Dam, Perlis

Friday - 12 June 2009

Revising the video preparation of Raising of Timah Tasoh Dam, Perlis

Calculating the number of piles required for the outlet structure based on the ultimate load, Qu obtained from the previous calculation