Monday - 11 May 2009
Reviewing of video preparation on Raising Timah Tasoh Dam, Perlis with Kak Kairun
Submittion of draft on the video outline to Ir Mohd Adnan, Managing Director of RPM Engineers
Comments include
a) Numbering System (ensure no repitation of numbering used)
b) Refferences
c) Chronology
Finalization of Detailed Design Report for the project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan - Package 2 for submittion
Tuesday - 12 May 2009
Revising the preparation of video for the project Raising of Timah Tason Dam, Perlis
Discussion with Hazrin, on details to be included in the video
Obtained pictures and presentation slides from RPM data storage
Overview of Rancangan Tebatan Banjir Sungai Linggi - Package 3 for design
Wenesday - 13 May 2009
Discussion with Ir Ng, Senior Engineer regarding the project Raising of Timah Tasoh Dam, Perlis on
a) Construction procceses involved
b) Components of dam
c) Drawings
Design of 100 yr water level using HEC-RAS on the project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan - Package 3. Problems involved
a) The water level in 100 yr ARI will completely submerge the downstream area where Pekan Linggi is
b) Since the river is connected to the Straits of Malacca, the sea level is one of the important issure where the level of water in the river would not be able to be reduced by a deepet section of river
c) Widening the river section would cause more land aquisition. It will increase the cost of the project
Thursday - 14 May 2009
Review on how to reduce the water level in Pekan linggi for the project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan - Package 3
Discussion with En Redwan on the construction of dam for the video making of Raising of Timah Tasoh Dam, Perlis
Review of excavation volume for the project, Rancangan Tebatan banjir Sungai Linggi, Negeri Sembilan - Package 1
Friday - 15 May 2009
Finalization on the review of excavation volume report
a) Obtained echo sounder data from contractor on 14 May 2009
b) Calculation of excavation volume as per design
c) Comparison between the volume of excavation as per drawing and work done
d) Contractor did not follow construction drawing. The river section is cut using a bigger section
e) Increase of volume of almost 80%
Obtaining additional data from the Feasibility Study for the porject Raising of Timah Tasoh Dam, Perlis
Preperation of power point for the project Raising of Timah Tasoh dam, Perlis