Summary of week 5

 

Monday - 18 May 2009

 

Submitting second draft to Kak Khairun on video preparation of Raising of Timah Tasoh Dam, Perlis for revision and discussion

Study on Design Flood Hydrograph Estimation for Rural Catchments in Peninsular Malaysia, Hydrological Procedure No 11

 

Tuesday - 12 May 2009


Study on Rational Method of Flood Estimation for Rural Catchments in Peninsular Malaysia, 1989, Hydrological Procedure No 5


Calculating the catchment area for Parit Haji Yusof and Sg Solok for Project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan - Package 3


Wenesday - 20 May 2009

 

Site Visit to Sungai Linggi With JPS Malaysia and Nsiba (contractor) to view the work progress of work


Discussion with contractor on the increase of volume for the project. 

- The increase of volume is partly due to the width of the river section downstream has increase from the last suvey used in design about double the size.

 

Thursday - 21 May 2009

 

Discussion with Kak Khairun on the video preparation for project Raising of Timah Tasoh Dam, Perlis. Comments include

a) Coding

b) Scene Number

c)  Content page for ease of editing


Discussion with Ir. Liam (technical director) regarding

a) Calculation of pond size for the project Rancangan Tebatan Banjir Sungai Linggi, Negeri Sembilan - Package 3

b)  Site visit made on 20 May 2009


Visit by Supervisor, Dr Ir Marlinda

Making ammendments to the video presentation for project Raising of Timah Tasoh Dam, Perlis


Friday - 22 May 2009

 

Making ammendments to the video preparation for project Raising of Timah Tasoh Dam, Perlis. Included story board in full sentences.


Submittion to Kak Khairun for revision and further discussion